Author:
Jamaaluddin J,Hadidjaja D,Sulistiyowati I,Suprayitno E A,Anshory I,Syahrorini S,Abdullah A G
Abstract
Abstract
One of the important things to do an electric power system operation is load forecasting. Load forecasting consists of short-term forecasting and short-term forecasting. The very short term load forecasting are required for regulating electrical energy generation, maintenance arrangements and regulating the labor involved. This forecasting is done to decide which plant to operate. The capacity of the plant to be operated adjusts to the load plan to be supplied the next day. The very short-term load forecasting is predicting electrical loads with time intervals every 30 minutes for the next day. In this study using Interval Type-2 Fuzzy Inference System (IT-2FIS) because it delivers a high flexibility that can be developed using other methods (hybrid). Laying out the footprint of uncertainty (FOU) membership function of the Interval Type-2 Fuzzy Inference System (IT-2FIS). This method has been applied for short- term load forecasting and will be employed for very short-term forecasting. In very short-term load forecasting IT-2 FIS has Mean Average Percentage Error (MAPE) arround 0,729%.
Reference8 articles.
1. Short Term Load Forecasting of Eid Al Fitr Holiday By Using Interval Type – 2 Fuzzy Inference System (Case Study : Electrical System of Java Bali in Indonesia);Imam Robandi;2016 IEEE Region 10, TENSYMP,2016
2. Short term load forecasting using Multiple Linear Regression;Amral,2007
3. Short term load forecasting for small scale power system using fuzzy logic;Khamis,2011
Cited by
9 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献