The purpose of the study is to optimize the construction project of a residential complex. The paper considers the mechanism for optimizing the construction of a residential building and a quarterly road network. The study was carried out in several stages and includes the breakdown of the complex into specialized types of work, the preparation of matrices of work volumes, the calculation of construction duration, the calculation of methods for organizing work in different order, and the calculation of the estimated cost of objects. The calculation and selection of the work organization method was carried out by the method of continuous use of resources, continuous development of work fronts and the critical path method. Next, statistical modeling of the deviation of the project duration from the planned value was performed in the Microsoft Project software package. The first step was to perform a regression analysis. The second step is a correlation analysis, which allowed us to determine the degree of reliability of the project. The third step is to analyze the effectiveness of the project. In conclusion, a conclusion is made regarding the relevance of the unified estimated standards for this project.
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献