Comparative Analysis of Learning Curve Models on Construction Productivity of Diaphragm Wall and Pile

Author:

SaravanaPrabhu G,Vidjeapriya R

Abstract

Abstract In the analysis of construction operations, Learning Curves (LC) are considered one of the most important factors that determines the on-site variation in the productivity, which is usually considered in the construction projects during the estimation and planning stage. This research attempts to assess the suitability of LC models for the analysis of the learning phenomenon using productivity data for fairly complicated construction operations concerning the Diaphragm Wall and Pile Construction process from large-scale construction projects. In this study, the role of different LC models (i.e., Wright or Straight Line, Quadratic, Cubic, Knecht or Combined Exponential Log-linear, Stanford B) is investigated by the comparison of their outcomes through the utilization of cumulative productivity data of the activities involved in the Diaphragm Wall and Pile Construction process. The two main research objectives are (i) the investigation of the model which is the best bit for the historical productivity data of the completed construction activities (ii) an endeavour is formed to work out which model predicts the future performance better. The best suited LC model is predicted based on the least deviation from the yielded results of each model with respect to the actual construction data. Analysis of the cumulative average productivity data predicted that the Knecht or Combined Exponential Log-linear Model best fits both the complete Diaphragm Wall and Pile Construction Process in both the cases of fitting Historical data and in predicting future performance.

Publisher

IOP Publishing

Subject

General Medicine

Reference38 articles.

1. Evaluating research methodology in construction productivity studies;Panas;Built Hum. Environ. Rev.,2010

2. The impact of management practices on mechanical construction productivity;Shan;Constr. Manag. Econ.,2011

3. Investigation and Comparative Analysis of Learning Curve Models on Construction Productivity: The Case of Caisson Fabrication Process;Ralli;J. Eng. Proj. Prod. Manag.,2020

4. Learning curve models of construction productivity;Thomas;J. Constr. Eng. Manag.,1986

5. A simulation environment for construction project manager competence development in construction management;Panas;Procedia-Social Behav. Sci.,2014

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. A new adaptive sampling algorithm for big data classification;Journal of Computational Science;2022-05

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3