Author:
Odubiyi T.B.,Aigbavboa C. O.,Thwala W. D.
Abstract
Abstract
The Professional Client/Consultants Service Agreement Committee (PROCSA) document describes the scope of construction services in South Africa into six stages spanning from stage 0 to stage 6. This study identified the ICT tool used from the project initiation (stage 0) to the construction (stage 5) in the South African construction industry. In this research, construction is classified into the planning, design/estimation, and actual construction. This study determines the ICT tools used in South Africa for construction activities. Through a questionnaire survey for construction stakeholders. An exploratory factor analysis revealed three clusters for the planning, two for the design/estimation, and three for the actual construction. As an implication, this study provides a framework for ICT tools as an infrastructure for development.
Reference47 articles.
1. Development and performance evaluation of a salt bath furnace;Alaneme;International Journal of Mechanical and Materials Engineering,2011
2. A Review of ICT Applications in Construction;Adwan;JOIV : International Journal on Informatics Visualization,2018
3. Digitalisation in Construction Industry: Construction Professionals Perspective;Aghimien;Proceedings of International Structural Engineering and Construction,2020
4. ICT adoption and diffusion in the construction industry of a developing economy: The case of the sultanate of Oman;Alkalbani;Architectural Engineering and Design Management,2013
5. Cost Studies of Buildings;Ashworth,2015
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献