Applications of work study techniques for improving productivity at assembly workstation of valve manufacturing industry

Author:

Akkoni P R,Kulkarniand Vinayak N,Gaitonde V N

Abstract

Abstract The work is carried to determine total cycle time to manufacture one gate valve assembly in valve manufacturing industry. Improvement in productivity can be achieved through more efficient use of capital investments, human resource, technological innovation and developments. The goal was to improve the productivity through more efficient use of capital and human resource. Plant layout is the arrangement of machines on shop floor. This arrangement of machines will have impact on total cycle time to produce finished product. The present study explains about the productivity improvement in the plant layout of Micon valve manufacturing industries which is one of the reputed industries in Dharwad, India . Data was collected about existing plant layout and about chain of flow of product, man or machine with help of flow process chart. This flow process chart was used to establish layout from the point of improving layout and to identify/decide the locations of different workstations. The results obtained from this research work indicated that in proposed method there was reduction in total cycle time of 73 minutes and the total distance travelled by 130meters, which lead to increase in productivity at the assembly line of valve manufacturing industry.

Publisher

IOP Publishing

Subject

General Medicine

Reference8 articles.

1. Productivity improvement in assembly workstation of motor winding unit;Kulkarni;Materials Today: Proceedings,2018

2. Productivity improvement at assembly station using work study techniques;Kamble,2014

3. A shortest route formulation of simple U-type assembly line balancing problem;Gökçen;Applied Mathematical Modelling,2005

4. Simple and U-type assembly line balancing problems with a learning effect;Toksarı;Applied Mathematical Modelling,2008

5. Productivity improvement of a motor vehicle inspection station using motion and time study techniques;Al-Saleh;Journal of King Saud University-Engineering Sciences,2011

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Enhancing productivity through work study - A case of electric power pole cross arm fabrication;Heliyon;2024-06

2. Productivity improvement of production line system using reduction of cycle time;PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON RECENT ADVANCES IN MANUFACTURING ENGINEERING RESEARCH 2021: ICRAMER 2021;2022

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3