Author:
Senthil Kumar J.,Kumar C.,Balavignesh S.,Dheepanchakkravarthy A.
Abstract
Abstract
A novel bi-level framework is developed for congestion management in electric power market by load curtailment and generator rescheduling. Interruptible load auction schemes are performed to detect the load buses which require corrective measures to relieve congestion. The proposed congestion management problem is solved in two different levels. The objective functions formulated as non-linear equation is solved using swarm intelligence techniques. In first level, the load curtailment problem is solved, while in second level the generator rescheduling problem is solved. Generator rescheduling through swarm based optimization techniques minimizes the curtailment of contracted power in a deregulated market. A comparative study has been carried out on the swarm intelligence techniques such as Cauchy Gaussian infused PSO (CGI-PSO) and Particle Swarm Optimization with Time Varying Acceleration Coefficient (PSO-TVAC) to solve the proposed problem. The formulated methodology is simulated on standard IEEE 30 bus system and verified through Indian utility-69 bus system.
Reference25 articles.
1. Transmission Management in the Deregulated Environment;Christie;IEEE transactions on Power Systems,2000
2. Congestion Management in Competitive Power Market: A bibliographical survey;Kumar;Electric Power Systems Research,2005
3. Transmission Congestion Management in competitive Electricity Market;Singh;IEEE transactions on Power Systems,1998
4. Congestion management coordination in the deregulated power market;Yamina;Electric Power Systems Research,2003
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献