Author:
Kuznetsov A S,Noskova E E
Abstract
Abstract
An approach to assess the efficiency of solving the problem of production planning at job-order small-scale manufacturing is presented. In consideration of their dimensionality, initial data are analyzed to build an optimal plan based on known scheduling methods for the production of different types. Reducing performance time of production plans by 10 % at the increase in the size of the order with technological operations for processes of different types at the use of directed exhaustive methods is shown.