Author:
Luo Dan,Guan Zailin,He Cong,Fang Weikang,Wang Chuangjian,Zeng Zhangyi
Abstract
Abstract
Researches on planning and scheduling of PCB production system are gaining more and more attention due to the complexity and uncertainty of it. Current research focused on the solving method how to make better schedule solution for PCB system based on a real case of PCB production enterprise. Firstly, for the bottleneck process of electroplating, a mixed integer programming model is proposed, moreover, a branch and bound method is employed to solve the problem. Secondly, for non-critical processes, the man-hour quota is predicted using the neural network model and the association rules, and then the data can be found using the association rules and be modified. Thirdly, the planning and scheduling method based on bottleneck is used for the order sequencing, and “pull-push” mechanism of Drum-Buffer-Rope are applied to generate the scheduling scheme for non-bottlenecks. In the end, the effectiveness of the proposed scheduling method is proved by computational experiments.
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献