Abstract
Abstract
This study is intended to calculate the fastest completion period of an apartment project in Medan by Waskita Karya. Since, Waskita Karya is a-projectbase state owned company, it is important to maintain its quality of every running projects. Apartment Project in Medan was potentially delayed and it would lead to a penalty from its project cost around Rp. 614.627.071.968. Project duration was 42 months. Several datas were gathered such as S-Curve, number of workers, and cost structures, also interviews. From Crashing Method calculation, this study shows that this project can be reduced optimally to 39 months but it would rise the total project cost to Rp. 618.665.777.827 which equal to price addition of Rp. 4.038.705.859
Reference13 articles.
1. The cost of speed: Work policies for crashing and overlapping in product development projects;Meier;IEEE Transactions on Engineering Management,2015
2. Cost & time and also minimum project duration using alternative method;Sahu;International Review of Applied Engineering Research,2014
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献