The ratio of changes in construction costs and development index of the standard analysis of construction costs for state buildings

Author:

Rachman Waliulu Yusroniya Eka Putri

Abstract

Abstract Wages rate and material price are an important part of a construction cost. The Construction Cost Index (CCI) that has been developed which applies to a certain area or period a basis for determining the bid price. This index is also very useful to forecasting construction cost which should reflect the comparison of wages rate and material price changes over time. Standard Construction Cost Analysis per m2 is one of the performance budget instruments to assess the budget of a construction project. Surabaya City Government applies that standard in set up government budget. SCC is composed of several Unit Price Analysis with a certain volume that design has been standardized. The composition of the labour and material price index, as a cost driver for Standar Construction Cost Analysis based on time units are expected to be used in the preparative of cost estimates for Building Construction and further research related to the effect of price increases on construction costs. The results obtained from this study are the construction cost change ratio in Surabaya for 2013-2016 increased average 17.3% per year; start from 2016 - 2020 increased not over 6,5% per year. Where as material cost change ratio tends to increase every year, except for 2014 - 2015 which has increase dramatically. In the other hand the labour price index indicate a constant increase because it was related to the Surabaya City Minimum Wage Rates, but in the early year in data (2013-2014) the Minimum Wage Rates significantly increased. In 2017-2018 labour cost change ratio increased more higher and material cost change ratio turn to decreased because the analysis used new guidelines for Analysis of Work Unit Prices for Public Works (Regulation of the Minister of Public Works and Public Housing of the Republic of Indonesia number 28 / PRT / M / 2016). The average component weight of the CCI according to the development of price are labour and foreman (41,3%), stone / brick (10,7%), roof truss and cover (10,4%), cement (8%), floor cover and paint (7,4%), wood (6,8%), iron bar (5,6%), accessories and complement (5,6%) and sand (4,2%). Material cost index tends to increase every year, except for 2018 and 2019 which has decreased. Whereas labour cost index indicated a constant increase because it was related to the UMK (City Minimum Wage) Surabaya. So that the CCI from 2013 to 2020 has increased from 1,00 to 1,93.

Publisher

IOP Publishing

Subject

General Medicine

Reference12 articles.

1. Construction price formation: full-cost pricing or neoclassical microeconomic theory?;Skitmore;Journal of Construction Management and Economics,2006

2. Factor Affecting Construction Cost in Mara Large Construction Project : Perspective of Project Management Consultant;Memon;International Journal of Sustainable Construction Engineering and Technology,2010

3. Predicting Changes in Construction Cost Indexes using Neural Networks;Williams;Journal of Construction Engineering and Management,1994

4. Dynamic Regression Models for Prediction of Construction Cost;Hwang;Journal of Construction Engineering and Management,2009

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Research on construction project cost budget and cost control based on matrix model;Applied Mathematics and Nonlinear Sciences;2023-10-23

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3