Abstract
Abstract
The article deals with the possibilities of intensification of mechanical-biological wastewater treatment plant with intermittent Flexidiblok type activity with denitrification. This wastewater treatment plant is located in a municipality with more than double of the equivalent population than the capacity of the wastewater treatment plant and therefore does not meet current legislative requirements. Proposals for the intensification of the wastewater treatment plant offer the possibility of reconstructing the existing wastewater treatment plant to the required capacity or rebuilding this wastewater treatment plant to a pumping station. Part of the article is an economic-technological comparison of both proposals.
Reference15 articles.
1. Restoration and renovation of wastewater pumping stations in case of emergency;Makisha;Procedia engineering,2016
2. A model-based approach for energy optimization of real wastewater pumping station;De Chiara,2020