Risk management in shipbuilding using bayesian network with noisy-or

Author:

Asdi R,Basuki M

Abstract

Abstract This paper presents a method for risk management applicable in shipbuilding projects. We focused this study specifically to assess delay in project completion by analysing the production processes. The production processes were grouped into three major parts, namely the work of design, material procurement, and production processes. Risk data were collected from risk documentation of fast patrol boat constructions in PT. PAL Indonesia (the company). Bayesian network was used to assess the probability of project completion delay. Noisy-OR canonical model was used to define parameters needed for the Bayesian network model. Based on the current condition, the Bayesian network model predicted that there is a probability of delay of 0.67761739 that the project completion will be delayed. The Bayesian network model was also used to assess mitigation actions to reduce the probability of delay. Three mitigation action sets were provided based on the complexity of mitigation action: (1) less complex mitigation action, (2) more complex mitigation action, and (3) most complex mitigation action. The Bayesian network model predicting that the most complex mitigation action would provide the best result in mitigating the project completion delay.

Publisher

IOP Publishing

Subject

General Medicine

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3