Abstract
Abstract
The purpose of this research is to determine the priorities of risks that might occur so that the implementation of project work can run smoothly and later can be used as a basis for making decisions in handling the project being worked on. One method that can be used to determine the priority of risks that arise in a project is the Failure Mode and Effects Analysis (FMEA). FMEA is one of the methods used to prevent project failures caused by project risks that arise. The results of this study are FMEA can be used to handle and determine the priority of risks that arise in the project and can be used by the person in charge of the project in making decisions in handling risks that arise in the project. By using FMEA project risks can be prevented and completed so that the project can be completed on time.
Reference12 articles.
1. Implementation of Critical Path Method in Project Planning and Scheduling;Atin;IOP Conference Series: Materials Science and Engineering,2019
2. Implementasi Probability Impact Matriks (PIM) Untuk Mengidentifikasi Kemungkinan Dan Dampak Risiko Proyek;Sufa’atin;Ultima InfoSys,2017
3. On risk defined as an event where the outcome is uncertain;Aven;Journal of risk research,2009
4. Project Complexity and Risk Management (ProCRiM): Towards modelling project complexity driven risk paths in construction projects;Qazi;International journal of project management,2016
5. Failure mode and effects analysis;Teng,1996
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. Risk analysis and safety improvement of plastic waste processing machine;THE 2ND NATIONAL CONFERENCE ON MATHEMATICS EDUCATION (NACOME) 2021: Mathematical Proof as a Tool for Learning Mathematics;2023
2. Implementation of the program evaluation and review technique (PERT) method to determine estimated time of project completion;SIXTH INTERNATIONAL CONFERENCE OF MATHEMATICAL SCIENCES (ICMS 2022);2023