Abstract
Abstract
All 19 ITER toroidal field coil structures (TFCSs) were successfully fabricated by the Japan Domestic Agency with solving technical challenges. This study presents the results of the welding-deformation control process, which is a remarkable challenge in an efficient fabrication of the TFCSs.