Author:
Xu Tongxin,Li Pengju,Liu Lu,Hu Penghui
Abstract
Abstract
In construction engineering, silicate binding material detection is the key work to ensure the safety of building structures. Although the current detection instruments have made great progress compared with the traditional detection methods, there are still problems such as low efficiency, heavy workload, and error-prone data due to manual operation. Based on the practical problems faced by silicate binding material quality detection, this paper studies the key technologies of the whole process digital intelligent detection system of silicate binding material, including multi-machine cooperative automatic dumping and scraping technology, multi-strategy robot scheduling algorithm and full-link traceability technology, and shows the application effect through the LIMS system function platform. The research effectively improves the working efficiency of silicate binding material detection, realizes real-time monitoring of data and unique coding of the whole process, and ensures the timeliness, authenticity, accuracy, and traceability of detection data.
Reference17 articles.
1. Related factors affecting the strength of cement mortar [J];Zheng;Research on urban construction theory (electronic version),2015
2. Experimental study on the change of cement mortar strength with water-cement ratio [J];Liu;Value engineering,2011
3. Underwater abrasion of steel fiber-reinforced self-compacting concrete;Abid;Case Stud. Constr. Mater.,2019
4. Sustainable masonry blocks: olive wood waste as substitute for fine aggregates;Antoun;Case Stud. Constr. Mater.,2021
5. Effectiveness of hybrid steel-basalt fiber reinforced concrete under compression;Khan;Case Stud. Constr. Mater.,2022