Author:
Chen F.,Zhou G. H.,Kong J.
Abstract
Abstract
In this study, we determined the variations of tidal flow field and tidal prism caused by human activities in Tongzhou bay and using MIKE 21 hydrodynamic model as analyzing tool. After the human activities, the hydrodynamic in sea area alongshore engineering is changed, the most obvious changes can reach over 0.1m/s; the tidal discharge decreases caused by the land accretion leading to the shrink of the area of Nantong near-shore waters, there is up to 12% reduction after planned reclamation during one spring tide period.
Subject
Computer Science Applications,History,Education