Abstract
Abstract
The goal of a construction project is to be able to carry out the construction project on time with the budget that matches the plan. However, due to several factors, cost overruns often emerge when executing a project. The purpose of this study is to analyze the dominant factor which leads to cost overruns on the drinking water distribution project in Banda Aceh. This study used primary data that were obtained by distributing questionnaires to contractors that are registered in LPJK company association of Aceh in 2020 and have ever been involved in the installation of drinking water pipes in Banda Aceh between 2015-2020. The population of this research was 62 contractors. By using Slovin equations, 54 contractors were selected as a sample of this research for a 5 percentile margin of error. The dominant factor that leads to cost overruns in drinking water distribution projects in Banda Aceh was caused by cost estimation factor with a mean value of 4,417. This indicates that based on the perception of the contractors, the dominant factor which lead to cost overruns in drinking water distribution projects in Banda Aceh was caused by cost estimation factor.
Subject
General Physics and Astronomy
Reference13 articles.
1. Using Risk Analysis to Determine Construction Project Contingencies;Mak;Journal of Construction Engineering and Management,2000
2. Persepsi tentang Contingency Cost Kontraktor di Indonesia: Sebuah Survei;Latupeirissa;Jurnal Teknik Sipil,2007
3. Analisa Overruns Biaya pada Beberapa Tipe Proyek Konstruksi;Santoso;Dimensi teknik sipil,1999
4. Faktor-Faktor Penyebab terjadinya Overrun Biaya Pada Proyek Konstruksi Gedung Di Makassar;Remi;Jurnal Teknik Mesin (JTM),2017
Cited by
13 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献