Author:
Ermolenko F I,Minnivaleev T N
Abstract
Abstract
The article discusses hydrodynamics of the reservoir fluid withdrawal from the promising drilled formation interval with the use of a jet pump installed in the internal cavity of the drill pipe string in the wellbore bottom-hole part. The hydrodynamic problem of fluid production is solved. The solution connects the dynamics of injected, recoverable and upward flows of the circulating system.
Subject
General Physics and Astronomy
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献