Li Xin,Guo Lijie,Xu Wenyuan
Abstract
Abstract
A phosphorus mine in Hubei Province adopts the roof cutting room pillar method of non rail equipment layered mining. With the extension of exposure time, the stress in the goaf further changes and the pillar has begun to damage, and the failure rate has a trend of increasing. In order to avoid large-scale goaf caving, the mine decided to adopt concrete cemented filling method to mine unstable pillars. In filling material preparation and filling system, mixing technology, equipment and conveying system play an important role. In this paper, according to the actual situation of the mine, we have carried out investigation, analysis and calculation, finally, the slurry transportation and mixing process, the pipeline transportation model and main pipeline transportation parameters has been determined. It provides a theoretical basis for the application of filling method.
Subject
General Physics and Astronomy
Reference10 articles.
1. Study on the rheological property and filling capacity of the filling slurry with fine tailings;Xianjun;Metal Mine,2011
2. Experimental Study on Adaptability of Strongly Weathered Granite as Filling Aggregate [J];Guoquan;Metal Mine,2017
3. Arching effect of long-narrow cemented paste backfill body and its effect on target strength;Aixiang;The Chinese Journal of Nonferrous Metals, Commun.,2016
4. Theoretical analysis and experimental research on the energy dissipation of rock crushing based on fractal theory;Deng;Journal of Natural Gas Science and Engineering, Commun.,2016
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献