Author:
Bisoffi G,Bellan L,Bellato M,Borille D,Bortolato D,Carletto O,Chiurlotto F,Comunian M,Conte A,Contran T,De Lazzari M,Fagotti E,Giacchini M G,Lollo M,Marcato D,Miglioranza M O,Modanese P,Moisio MF,Montis M,Munaron E,Nigrelli G,Pavinato S,Pengo M,Pisent A,Poggi M,Pranovi L,Roncolato C,Rossignoli M,Scarpa D
Abstract
Abstract
The ALPI linac at INFN-LNL was substantially refurbished in 2018, especially in view of its use as secondary accelerator for exotic species in the framework of the SPES project. In particular: 10 magnetic triplets were replaced with higher gradient ones; two cryomodules with quarter wave resonator were moved from the PIAVE injector to ALPI, so as to make them available both for exotic and stable beams; the cryogenic plant was renovated; the whole linac, its injector and its beam lines were eventually realigned via LASER tracking (LT). The expected outcome of the refurbishment project is a larger beam transmission (crucial for the efficient transport of the unavoidably low current exotic beams) and improved overall reliability so as to further extend the lifetime of an already 25 years old machine. The hardware commissioning of this new configuration will be reported.
Subject
General Physics and Astronomy
Reference7 articles.
1. Progress in the Realization and Commissioning of the Exotic Beam Facility SPES at INFN-LNL;Bisoffi;Journal of Physics Conference Series,2018
2. Towards the First Beams From the ADIGE Injector for the SPES Project;Galatà;Journal of Physics Conference Series
3. Beam Commissioning of the Renovated PIAVE Injector at INFN-LNL;Bisoffi
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献