Progress and TDR plans of the Mechanical system of CEPC
-
Published:2019-11-01
Issue:1
Volume:1350
Page:012165
-
ISSN:1742-6588
-
Container-title:Journal of Physics: Conference Series
-
language:
-
Short-container-title:J. Phys.: Conf. Ser.
Author:
Wang H,Bai S,Li M,Liu Y,Meng C,Qu H,Wang J,Zhang P,Zhou N
Abstract
Abstract
The TDR of CEPC is aimed at the key science and technology problems and makes preparations for the real project. This paper will describe the progress of mechanical system including the regular supports and transport vehicle design, the mockup plan, the installation scenario of machine detector interface (MDI) and the movable collimator, as well as the TDR plans of mechanical system.
Subject
General Physics and Astronomy
Reference5 articles.
1. IR Assembly;Kanazawa,2018
2. Design of Beam Collimators for SuperKEKB;Ishibashi,2014
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. Main mechanics issues of CEPC MDI in TDR;International Journal of Modern Physics A;2021-07-23