Author:
Marleno Risma,Witjaksana Budi,Oetomo Wateno,Arifatuzzahro
Abstract
Abstract
Facing the flood problem is a homework from the Tuban Regency Government that must be completed in the near future, for that the Construction of the Village Flood Control Reservoir Jadi Tuban Regency is one of the efforts to answer the task, and can implement on time, a mitigation needed in an attempt to prevent project delays.
This study uses the HOR method (House Of Risk) which is a framework consisting of HOR 1 and HOR 2 wherein this method steps taken by mapping the risk events with FMEA steps, looking for risk-causing agents, analyzing risk agents by determining the Aggregate Risk Potential (ARP), evaluates risk-causing agents with Pareto diagrams, and identifies proactive actions, and establishes priorities for handling / mitigating the causes of delays.
In this research, the risks are 18 risk events, 67 agents are the cause of risk, and the highest priority is handling the determination of a qualified contractor in providing capital, materials, labor, and equipment as well as a contractor who has a solid work team and has the right implementation method and in accordance with Location and Weather, being able to overcome Project delays project delays.
Subject
General Physics and Astronomy
Reference15 articles.
1. Analisa Ekonomi Perbaikan Jalan Palembang-Betung Kab. Banyuasin Terhadap Nilai Kerugian Akibat Kemacetan;Armada;J. Civ. Environ. Eng.,2014
2. Pengaruh sifat fisik agregat terhadap rongga Dalam campuran beraspal panas;Rondonuwu;J. Sipil Statik,2013
3. Establishing and processing client requirements—a key aspect of concurrent engineering in construction;Kamara;Eng. Constr. Archit. Manag.,2000
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. Risk Mitigation to Minimize Distribution Delays and Empty Stock at Industrial Jakarta Gas Station;2022 International Conference on Data Analytics for Business and Industry (ICDABI);2022-10-25