1. To increase the throughput of the Baikal-Amur Mainline and Transsib, it will be necessary to practically double the consumption of electric power
2. Stabilizing the control of a plant material drying process in off-grid power systems;Shamarova,2019
3. Automation of failure forecasting on the subsystems of the railway transport complex in order to optimize the transportation process as a whole;Konstantinova;IOP Conf. Series: Materials Science and Engineering,2020
4. Set of organizational, technical and reconstructive measures aimed at improvement of section performance indicators based on the study of systemic relations and regularities of functioning of railway transport system;Olentsevich;IOP Conf. Series: Materials Science and Engineering,2019