Author:
Zhou Jianxin,Wang Yunlong,Ding Bin
Abstract
Abstract
The comprehensive pipe gallery is a tunnel space built underground in the city, which can centrally lay all kinds of municipal pipes in the tunnel for unified management, which can not only protect the pipes, but also improve the land utilization rate. However, with the increasing of integrated pipe gallery construction and pipeline inclusion, various safety accidents have appeared, among which the fire risk of cable cabin is the greatest. This paper mainly studies the fire safety of cable cabins of integrated pipe gallery based on numerical simulation. In this paper, PyroSim fire software was used to simulate the fire accident in construction. Through the investigation of the construction site, simulation parameters were set to simulate the fire situation in a real and objective way. The temperature, smoke and visibility changes under different working conditions were studied by setting several groups of thermocouples, smoke sensing points and visibility slices.
Subject
General Physics and Astronomy
Reference12 articles.
1. Qualification of Composite Pipe [J];Carpenter;Journal of Petroleum Technology,2016
2. Research on the Key Technology of Small Diameter Shield Machine in Municipal Comprehensive Pipe Gallery [J];Duan;Journal of Railway Engineering Society,2017
3. Risk Analysis of Integrated Pipe Gallery PPP Project Based on the Analytic Hierarchy Process [J];Yue;Open Access Library Journal,2019
4. Effect of fiber and resin types on mechanical properties of fiber-reinforced composite pipe [J];Gokce;Emerging materials research,2019
5. Research on application path of building information modeling (BIM) technology in construction of visualization of urban pipe gallery [J];Guo;Revista de la Facultad de Ingenieria,2017
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献