Construction cost control and duration analysis of rehabilitation project

Author:

Koroteev D D,Huang Jueru,Kamrunnaher Mimi

Abstract

Abstract In the process of rapid urbanization, the green ecological project is not only an important part of the function of urban space, but also an important way to promote the implementation of ecological civilization in the industrial economy and society. In China green ecological project is mainly embodied in the form of urban landscape engineering. Due to the expansion of the size of the city and the increase of the urban population, many of the original urban landscape projects cannot be matched with the current situation. Such as the original vegetation is destroyed, the equipment becomes old, functional single and so on. Today if the re-construction of the project under the original engineering conditions is carried out, this kind of re-construction project is called the green ecological project. And the construction of the rehabilitation project is called an effective means to realize the value of green ecological projects. This paper takes the landscape and greening re-construction project of Kaifeng West Division scenic spot as the research object, through the system of construction cost control and the construction period analysis research, the case on behalf of the re-construction of the construction.

Publisher

IOP Publishing

Subject

General Physics and Astronomy

Reference17 articles.

1. Methodology for accounting the net mitigation of China’s ecological restoration projects;Liu;(CANM-EP) MethodsX,2019

2. Comparative whole-building life cycle assessment of renovation and new construction;Hasik;Building and Environment,2019

3. The Challenges of Monitoring Energy Consumption to Assess Behavioural Changes in Occupants During Renovation Projects from a Low Budget Point of View;Jimenez-Bescos;Energy Procedia,2016

4. Do Longer Projects Have Larger Cost Deviation Than Shorter Construction Projects;Belay;Procedia Engineering,2017

5. Time-cost relationship for predicting construction duration;Czarnigowska;Archives of Civil and Mechanical Engineering,2013

Cited by 8 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Heuristic method of forming and assessing the plan of contractor works;PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON ENGINEERING RESEARCH AND APPLICATION 2022 (ICERA 2022);2023

2. Methodology for selection of rational organizational and technological solutions at the stages of pre-design and design preparation of construction object;PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON ENGINEERING RESEARCH AND APPLICATION 2022 (ICERA 2022);2023

3. Evaluation of the efficiency of capital investments depending on the specified profitability and duration of construction;PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON ENGINEERING RESEARCH AND APPLICATION 2022 (ICERA 2022);2023

4. Technical feasibility of using thermal destruction technologies for construction materials during the reconstruction of the operating enterprises;PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON ENGINEERING RESEARCH 2021 (ICER 2021), MOSCOW, RUSSIA;2022

5. Organization of material and technical support for the construction of large-panel buildings;PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON ENGINEERING RESEARCH 2021 (ICER 2021), MOSCOW, RUSSIA;2022

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3