Abstract
To address the voltage profile, the reactive power requirements in the UK Grid Code have risen due to increasing power flows and the wind turbine system volume. This study strives to figure out the reactive capability of HPR1000 NPP in the UK grid and presents ETAP-based modeling and simulation of the demonstration. The paper first introduces the UK grid’s reactive capability requirements, then analyses the theory of synchronous generator reactive capability and unit transformer tap changer sizing, and finally demonstrates the sizing of reactive generator capability and unit transformer tap changer via load flow studies. The reactive capability requirements of the UK grid are more severe than China, causing the synchronous generator with a larger reactive capability [0.83PF(lagging), 0.98PF(leading)] and the unit transformer with a larger range of on-load tap changer[-10×1.25% / +4×1.25%], which should be concerned during HPR1000 NPP exportation.
Subject
Computer Science Applications,History,Education
Reference7 articles.
1. HPR1000: advanced pressurized water reactor with active and passivesafety;Xing;Engineering,2016
2. Transformer Tap Selection of Generating Set in Power Plants Abroad [J];Chen;Shandong Electric Power,2015
3. Study on the Selection of Transformer Taps of Foreign Power Plant Based on ETAP Simulation [J];Liu;Jilin Electric Power,2012