Justification for the parameters of extraction panels under the conditions of increased water inflows using computer models of rock mass
-
Published:2020-11-01
Issue:1
Volume:1661
Page:012110
-
ISSN:1742-6588
-
Container-title:Journal of Physics: Conference Series
-
language:
-
Short-container-title:J. Phys.: Conf. Ser.
Author:
Sidorenko A A,Belova D V,Sirenko Y G
Abstract
Abstract
The purpose of the research is to increase the efficiency of underground mining of flat coal-bearing seams with powered longwalls in the areas characterized by complex hypsometry and high water inflows. The modern global trend to increase the size of extraction panel (the length of longwall and the length of column) during the development of flat coal-bearing seams is shown. The results of the development of a three-dimensional model of the array are presented, which allows building profiles of the earth surface and the developed seams in the areas with complex hypsometry. The applicability of the use of such models to determine the rational place for the formation of dismantling chamber is shown. The interrelation between the length of longwall and the length of extraction panel during the mining thick coal-bearing seams is shown. The assessment of the additional costs and damages caused by the division of the extraction panels into two parts is carried out to ensure an upward order of mining reserves under the conditions of increased water inflows. The field of rational application of the division of extraction panel into two parts for the conditions of the mine site named after V.D.Yalevsky is determined.
Subject
General Physics and Astronomy
Reference12 articles.
1. Analysis of the methods of calculating the main roofcaving increment in mining shallow coal seams with long breaking faces;Kazanin;ARPN Journal of Engineering and Applied Sciences,2019
2. Status and directions of improvement of development of coal seams on perspective Kuzbass coal mines;Zubov;Zapiski Gornogo instituta,2017
3. The required for the daily production of coal from lava length of 400 meters in the conditions of the mine named after V.D. Yalevsky;Kalinin;Bulletin of the Kuzbass State Technical University,2018
4. Improvement of a longwall recovery room erection technology;Kazanin;International Journal of Civil Engineering and Technology (IJCIET),2019
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. 3D solid design algorithms;Journal of Physics: Conference Series;2021-10-01