Wu Y,Ding QJ,zhang HL,Hu FG,Dai CE,Zhang ZQ,zhang SY
Abstract
Abstract
In order to realize the accurate calculation of the temperature field of concrete hydration heat, the paper takes the concrete hydration heat temperature field of the pile cap of Liexi Bridge as a case for simulation analysis. Firstly, a three-dimensional finite element model of concrete hydration heat temperature field is established; Then, the temperature field of the hydration heat of the concrete cushion cap of the Liexi Bridge is simulated. The experimental results show that the maximum actual measured temperature of the core point of concrete hydration heat temperature is 63.1 °C, and the corresponding calculated temperature is 62.2 °C. The maximum actual measured temperature of the surface point is 54.8 °C, and the corresponding calculated temperature is 53.8 °C. The maximum temperature difference between inside and outside is 18.9 °C, and the corresponding calculated temperature is 13.4 °C. The research results show that the calculation model has high accuracy
Subject
Computer Science Applications,History,Education
Reference12 articles.
1. Crack Control of Mass Concrete Construction;Jian,2012
2. Mass Concrete Construction of Foundation Engineering in Zibo Sports Center Stadium;Hui,2008
3. Temperature control of the massive concrete of the Krasnoyarsk hydroelectric station dam.;Dolrnatov;Hydrotechnical Construction,1968
4. Prevention measures of temperature shrinkage crack in mass concrete of highway construction;Gong,2010
5. Copyright - Thermal Stresses and Temperature Control of Mass Concrete.;Chen;European Journal of Phycology,2013
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献