Author:
Feng Zhanwen,Sun Mingyi,Wang Zhonghui,Jin Xiaoming,Zhang Yu,Zhao Bin
Abstract
Abstract
In winter heating period, in order to meet the heating requirements, the cogeneration unit adopts the operation mode of “heat fixed power”. The peak regulation capacity is poor, and a large amount of wind is abandoned in the period of low load. In view of this problem, the characteristics of cogeneration units are analyzed, and relevant research results at home and abroad are summarized. This paper analyzes the scheme of increasing electric boiler, heat pump and heat storage from the aspects of increasing thermoelectric coupling equipment and power grid lean dispatching, puts forward the method of power grid lean dispatching of thermoelectric cogeneration units, and expounds the practical application of thermoelectric coupling constraint decoupling at home and abroad. At last, the next work of power side and power grid dispatching side is pointed out.
Subject
General Physics and Astronomy
Reference10 articles.
1. Research on peak regulation capability of 300 MW combined heat and power plant;Tong;Electric Power,2014
2. Management of fluctuations in wind power and CHP comparing two possible Danish strategies;Lund;Energy,2002
3. Energy system analysis of 100% renewable energy systems-the case of Denmark in years 2030 and 2050;Lund;Energy,2009
4. Research and practice for energy-saving power generation and dispatching of cogeneration power unit;Jianwei;Electric Power,2009
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献