Optimization of Orifice Metering Station Construction with Time Cost Trade Off Methods

Author:

Ginting Muhrowi Afrizal,As’adi Muhammad,Fajriah Nur

Abstract

Abstract Delay is a common problem in project. In case of building project, the delay in project completion means that the user has to pay penalty corresponding to contractual agreement with the host. The construction of the Seberida Metering Station Engineering Procurement Construction & Commissioning (EPCC) project has been delayed. Based on the project’s physical progress scheduling report. The user demanded by the host to complete the project on time. One solution that can be done to overcome the project delay is to accelerate the duration of the project. However, the acceleration of the duration must be carefully calculated so that the project can be completed on time and the additional costs incurred as a consequence of reducing the duration do not swell. This Research uses the Time Cost Trade Off (TCTO) method as a solution to overcome delays, namely the method of scheduling projects by exchanging time and costs. From the results of the analysis with the Time Cost Trade Off method, it was found that the construction of the Metering Station was accelerated for 50 days, from the total duration of the project which normally takes 180 days to 130 days with an additional cost of $ 80,047.01.

Publisher

IOP Publishing

Subject

General Physics and Astronomy

Reference13 articles.

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3