Author:
Khaimovich I N,Chaeva S U
Abstract
Abstract
The article analyzes the production process and equipment for producing FLRY-25-C wire; simulation experiments were carried out in AnyLogic, which allow assessing the effect of changing various system parameters on the output of the final product. The author identified a number of problems in the production cycle of manufacturing wire FLRY-25-C and proposed measures to improve the efficiency of this process. As a result, it was found that the implementation of the proposed measures helps to reduce the duration of the production cycle for the wire manufacture by 68 hours, respectively and to increase the productivity of the process by 40%.
Subject
General Physics and Astronomy