Optimization of Digging and Loading Equipment and Hauling for Overburden Production with Quality Capacity Methods and Queing Methods in East Pit, August 2017 Period Pt. Artamulia Tata Pratama, Site Tanjung Belit, Bungo, Jambi
-
Published:2019-11-01
Issue:1
Volume:1387
Page:012106
-
ISSN:1742-6588
-
Container-title:Journal of Physics: Conference Series
-
language:
-
Short-container-title:J. Phys.: Conf. Ser.
Author:
Gusman M,Asri Y,Prengki I
Abstract
Abstract
In the mining process, the availability of dump truck equipment and loading equipment will determine the sustainability of production which has an impact on productivity and efficiency. The purpose of this study is to optimize production on stripping the overburden using the queuing method, match factor. The location of the study was conducted at PT. Artamulia Tata Pratama, Tanjung Belit, site Bungo, Jambi in August 2017 – September 2017. The loading equipment used is the PC 1250 Komatsu Excavator and the Komatsu HD 465-7 dump truck. The simulation results of the number of dump trucks needed based on production capacity is 17 units while based on queuing theory there are 17 units. Where the actual dump trucks used were 19 units.
Subject
General Physics and Astronomy
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献