Author:
Aurachman Rio,Ajiguno Tito,Putri Ericha Mutia
Abstract
Abstract
Petroleum-producing wells sometimes facing production problem. These problems can be solved by deploying a Maintenance fleet that requires 2 days of travel and 3 days of repair time for the well. With 80 wells that are probabilistically appearance of problem, we need a Mathematical model that can minimize idle time of the well, in the condition of not Produce any. Trought this research, obtained problem solving formulation using the Dynamic Programming approach. The first step of this research are building an influence diagram.
Subject
General Physics and Astronomy
Reference20 articles.
1. Exploring the internal and external constraint of it business start up in Bandung, Indonesia;Chumaidiyah,2019
2. Strategy for Capability Development of Knitting Small Medium Enterprises Using SWOT Analysis;Chumaidiyah,2018
3. Inventory policy for relining roll spare parts to minimize total cost of inventory with periodic review (R, s, Q) and periodic review (R, S)(Case study: PT. Z);Kuncoro,2018
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献