Author:
Xue Bin,Ma Xiaowei,Chu Yunlong,Lan Xuanli,Zhang Tianyu,Wang Yang
Abstract
Abstract
Recently, with the rising proportion of new energy installed capacity in China, the problem of new energy consumption in the northwest region is particularly prominent, and the phenomenon of abandoning wind power and solar power is serious. In order to alleviate this situation, this paper proposes an annual maintenance plan optimization method for new energy consumption. Under the premise of considering the new energy output, the goal is to minimize the limited power of new energy generation and the minimum cost of maintenance. Transmission maintenance planning model is mixed integer linear programming model and can be solved by a solver such as CPLEX. The feasibility of the method is verified by a provincial power grid example, which effectively reduces the limited power of new energy generation.
Subject
General Physics and Astronomy
Reference6 articles.
1. The Analysis of Key Factors and Solutions for New Energy Elimination. [J];Shu;Proceedings of CSEE,2017
2. Through Ultra-high Voltage DC to Achieve Large-scale Energy Base Wind, Photovoltaic, Thermal Power High-efficiency Safe Delivery Research. [J];Liu;Proceedings of CSEE,2014
3. Consider the Overhaul Plan of Large-scale Wind Power Generators. [J];Fang;Automation of Electric Power Systems,2010
4. Preventive maintenance scheduling in power generation systems using a quantitative risk criterion;Billinton;Canadian Electrical Engineering Journal,1983