Abstract
Abstract
Large power transformer is the main noise source of substation. With the increase of voltage grade and rated capacity, the noise radiation value of power equipment continues to increase, which has a great influence on the noise standard of substation boundary. In this paper, two test conditions of no-load voltage and load current are considered. The transformer noise testing datum is constructed. The distribution law of factory noise SPL of 220kV oil-immersed transformer is obtained. The test results provide accurate test data for transformer factory noise evaluation.
Subject
General Physics and Astronomy
Reference10 articles.
1. Mechanisms of noise generation of model transformer cores;Weiser;Journal of Magnetism and Magnetic Materials,1996
2. Investigations of core noise levels using a dry-type transformer model;Valkovic;Journal of Magnetism and Magnetic Materials,2008
3. Causes of noise generation & its mitigation in transformer. International Journal of Advanced Research in Electrical;Negi;Electronics and Instrumentation Engineering,2013
4. The role of load harmonics in audible noise of electrical transformers;Ertl;Journal of Sound and Vibration,2014
5. Assessment of the stress sensitivity of magnetostriction in grain-oriented silicon steel;Anderson;IEEE Transactions on Magnetics,2007