Author:
Li Hui,Liu Zifa,Yu Puyang,Wang Zhidong,Zhao Lang
Abstract
Abstract
The optimization of multi-regional power grid investment projects is the basis for ensuring the benefits of power companies and can meet the urgent needs of power grid development. This article first takes the historical benefits of power grids, planning benefits, power grid scale and development needs as indicators to establish a multi-regional power grid investment project optimization index system. Then this article puts forward the investment project optimization model. With the goal of maximizing investment benefits, with project portfolio constraints, grid scale development demand constraints and investment constraints as constraints, the binary particle swarm algorithm is used to optimize the investment project portfolio schemes of various regions. Finally, an example is used to verify the effectiveness and feasibility of the method proposed in this paper.
Subject
General Physics and Astronomy
Reference13 articles.
1. Balancing cost and reliability a quantitative study at Atlantic Electric;Sudhir;J. IEEE Transactions on Power Systems.,1997
2. Cost-benefit analysis of power system reliability two unility case studies;Neudorf;J. IEEE Transactions on Power System.,1995
3. Value-based reliability transmission planning;Dalton;J. IEEE Transactions on Power System.,1996
4. Construction and safety analysis of North China-Central-East China UHV synchronous power grid;Zhang;J. Proceedings of the Chinese Society of Electrical Engineering.,2010
5. Initial evidence for self-organized criticality in electric power system blackouts;Carreras,2000
Cited by
4 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献