Study of determining the toll fare for the Yogyakarta-Solo corridor

Author:

Anas R,Sembiring I S

Abstract

Abstract As part of the government policy related with the development of road infrastructure, the acceleration of the toll road investment is expected to be able to push the road network performance and the regional economy. One of the plans is the development of Yogyakarta-Solo toll road with the length of segment is ± 40,5 Km. The basic toll rate is set in the beginning during the concession time as one of the parameters of a toll road investment. Based on the design of particular toll road, this research is then done to determine the particular basic toll rate. The methods that may be used as approaching the determination of the particular rate, such as: Saving of Vehicle Operating Cost Method (saving of VOC), Willingness to Pay (WTP), and Ability to Pay (ATP). From the toll rate calculation results based on the saving VOC and ATP/WTP analysis result, with the assumptions for the toll road to begin operating in the year 2018, hence the proposed value of the Yogyakarta-Solo toll rate is Rp. 26.000 (+ Rp. 675/km).

Publisher

IOP Publishing

Subject

General Physics and Astronomy

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3