Author:
Tian Bo,Wang Hujun,Wang Yang,Ning Kangjie,Duan Lanlan,Liu Jin,Zhang Haifeng,Zhao Ji
Abstract
Abstract
In the hydraulic structures of hydropower station and water conservancy project, sluice is one of the most important parts, which undertakes the tasks of flood control, sand flushing and water inflow. The water outlet can be closed or opened completely or partially according to the need. In order to better play the role of hydropower plants and water conservancy projects, the protection of hydraulic structures. Setting up computer monitoring system at these outlets can flexibly implement the automatic control of all kinds of sluices. Therefore, this paper studies the construction of computer system in sluice automation control. The second development is mainly based on the existing computer monitoring system to meet the functions of sluice gate data acquisition and processing, simple basic control, etc. Combined with the needs of local hydropower plants, the sluice flow detection and statistics, sluice gate group control functions are constructed. In this way, multiple sluices can be controlled at one time. Through real-time monitoring of the gate status and taking data modeling, the opening size of the gate can be calculated to realize the automatic control of each gate. Through the practical test results meet the design requirements, the running condition is normal.
Subject
General Physics and Astronomy
Reference10 articles.
1. Investigation of extremum depth of sluice stilling basin under the most unfavorable conditions;Huang;Shuili Fadian Xuebao/Journal of Hydroelectric Engineering,2015
2. The analytic solution of the shallow-water equations with partially open sluice-gates: the dam-break problem;Cozzolino;Advances in Water Resources,2015
3. A systematic designapproachofa float type sluice gate for flow measurement automation;Liu;IFAC-PapersOnLine,2018
4. A research on the application of fuzzy iteration clustering in the water conservancy project;Lu;Journal of Cleaner Production,2017
5. Fuzzy multi-mode time-cost-quality tradeoff optimization in water conservancy project;Guan;Shuili Fadian Xuebao/Journal of Hydroelectric Engineering,2015
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献