Comment on ‘Egypt’s water budget deficit and suggested mitigation policies for the Grand Ethiopian Renaissance Dam filling scenarios’

Author:

Wheeler Kevin,Jeuland MarcORCID,Strzepek Kenneth,Hall Jim,Zagona Edith,Abdo Gamal,Basson Thinus,Blackmore Don,Block Paul,Whittington Dale

Abstract

Abstract In their recent paper in ERL, ‘Egypt’s water budget deficit and suggested mitigation policies for the Grand Ethiopian Renaissance Dam (GERD) filling scenarios,’ Heggy et al (2021 Environ. Res. Lett. 16 074022) paint an alarming picture of the water deficits and economic impacts for Egypt that will occur as a consequence of the filling of the GERD. Their median estimate is that filling the GERD will result in a water deficit in Egypt of ∼31 billion m3 yr−1. They estimate that under a rapid filling of the GERD over 3 yr, the Egyptian economy would lose US$51 billion and 4.74 million jobs, such that in 2024, Gross Domestic Product (GDP) per capita would be 6% lower than under a counterfactual without the GERD. These and other numbers in Heggy et al (2021 Environ. Res. Lett. 16 074022) article are inconsistent with the best scientific and economic knowledge of the Nile Basin and are not a dependable source of information for policy-makers or the general public. In this response to Heggy et al (2021 Environ. Res. Lett. 16 074022) we draw on high quality peer-reviewed literature and appropriate modeling methods to identify and analyze many flaws in their article, which include (a) not accounting for the current storage level in the High Aswan Dam reservoir (b) inappropriately using a mass-balance approach that does not account for the Nile’s hydrology or how water is managed in Egypt, Sudan and Ethiopia; (c) extreme and unfounded assumptions of reservoir seepage losses from the GERD; and (d) calculations of the economic implications for Egypt during the period of reservoir filling which are based on unfounded assumptions. In contrast to Heggy et al (2021 Environ. Res. Lett. 16 074022), robust scientific analysis has demonstrated that, whilst there is a risk of water shortages in Egypt if a severe drought were to occur at the same time as the GERD reservoir is filling, there is minimal risk of additional water shortages in Egypt during the filling period if flows in the Blue Nile are normal or above average. Moreover, the residual risks could be mitigated by effective and collaborative water management, should a drought occur.

Publisher

IOP Publishing

Subject

Public Health, Environmental and Occupational Health,General Environmental Science,Renewable Energy, Sustainability and the Environment

Reference47 articles.

1. Water resources in Egypt and their challenges, Lake Nasser case study;Abd Ellah;Egypt. J. Aquat. Res.,2020

2. Al-Jazeera interview with Essam Heggy.,2021

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3