Large areas of the former British nuclear test site at Maralinga were contaminated by the explosive dispersal of plutonium. The Australian Government, in consultation with stakeholders, determined that the site should be cleaned-up so that it is fit for unrestricted habitation by the Aboriginal traditional owners (Maralinga Tjarutja). Engagement with the stakeholders, particularly the Maralinga Tjarutja, determined that the specific criterion for rehabilitation was 5 mSv y−1 and that some restrictions on permanent occupancy should remain. Remediation of the site began in 1995, took 5 years and cost AU$106 million. The site was returned to its traditional owners in 2009 and is now the site of a flourishing tourism operation.
Subject
Public Health, Environmental and Occupational Health,Waste Management and Disposal,General Medicine
Reference8 articles.
1. Rehabilitation of the former nuclear test sites at Emu and Maralinga (Australia),2003
2. Inhalation doses for aboriginal people reoccupying former nuclear weapons testing ranges in South Australia;Johnston;Health Phys.,1992
3. Human respiratory tract model for radiological protection;Ann. ICRP,1994
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献