Abstract
Abstract
The installation of penstocks in the construction of water conservancy and hydropower projects should be a key link in the quality control of hydropower projects. It is of great significance to the stability and safety of hydropower projects. Based on the construction process requirements of the steel pipe in the tunnel of a water conservancy project in South China, this paper has developed an all-position automatic welding technology of single-sided welding and double-sided forming of the inner circumferential seam of a super large diameter steel pipe after many tests, and analyzed the factors affecting the welding quality. After repeated trials and adjustments of process parameters, a lower welding voltage (small molten pool) and a larger welding current (guaranteed penetration) are used to ensure a certain deposition efficiency, and finally stable welding quality is achieved. It has certain reference significance for the improvement and improvement of the automatic welding technology of single-side welding and double-side forming of large-diameter steel pipes.
Reference14 articles.
1. An analysis on the slaking and disintegration extent of weak rock mass of the water tunnels for hydropower project using modified slake durability test [J];Selen;Bulletin of Engineering Geology and the Environment,2020
2. Mechanism for large-scale canyon deformations due to filling of large reservoir of hydropower project [J];Jiang;Scientific Reports,2020
3. Timescapes of Himalayan hydropower: Promises, project life cycles, and precarities [J];Lord,2020
4. Preliminary study on the exploitation plan of the mega hydropower base in the lower reaches of Congo River [J];Chuanyu;Global Energy Interconnection,2020
5. Nonlinear model of flaw detection in steel pipes by magnetic flux leakage [J];Altschuler;Ndt & E International,1995