Author:
Nunusara Werdhi,Maulana Adi,Tonggiroh Adi
Abstract
Abstract
Geostatistical modeling in this study requires a distribution of drill points that have a fixed dimension so that they can produce a reserve accuracy match that is the same as the variograph. The choice of reserve estimation method is prioritized by determining the geological domains of limonite, saprolite and bedrock through a geostatistical approach, namely ordinary krigging (OK) and inverse distance weight (IDW) with the JORC standard (2012), for the accuracy of the limonite and saprolite zone boundaries. The reserve model has shown a definite model of the limonite and saprolite zones and can be used further. By using simulations on cut-off grade (COG) to calculate resources and classify mineral resources, the estimation results obtained mean nickel levels above 1.40% so that the CoG to be used must be greater than Ni 0.90% for limonite, and Ni 1.10% for saprolite. The results of modeling the geometry of laterite nickel ore obtained that the total tonnage shown in limonite was 0.36 wmt (wet metric ton), inferred 0.10 wmt, and indicated in saprolite was 0.58 wmt, inferred was 0.40 wmt.
Reference9 articles.
1. Beyond the pan-European standard for reporting of exploration results, mineral resources and reserves;Krzemień;Resources Policy September,2016
2. Application of mineral deposit models in exploration: a case study of sediment-hosted gold deposits, Great Basin, Western United States;Adams;Geological Society,1992
3. 3D modeling of the laterites on top of the Koniambo Massif, New Caledonia: refinement of the per descensum lateritic model for nickel mineralization;Quesnel;Miner Deposita,2017
4. Ni grade distribution in laterite characterized by geostatistics, topography, and the paleo-groundwater system in Sorowako, Indonesia;Ilyas;Journal of Geochemical Exploration,2016