Author:
Ashayeri I,Goulding J,Heesom D,Arif M,Moore N,Obi L,Ahmed N,Saini M
Abstract
Abstract
Several countries have started to more purposefully apply advanced offsite delivery approaches to meet specific housing shortages. The United Kingdom (UK) is no exception. Whilst the concepts and benefits of Modern Methods of Construction are ‘typically’ well understood, it is generally accepted that there is a paucity of knowledge on the actual understanding of optimization per se, ergo, the interrelationships between processes, and the wider understanding of ‘pooling’ [resource management] to promote and maximize synergy - especially to target areas of lag or bottlenecks. In this respect, the research methodological approach adopted in this paper used a single case study to critically evaluate an offsite steel-frame solution for the offsite market to deliver social housing. This approach also evaluated the potential of Generative Design, Discrete Event Simulation, and Digital Twins. Findings of this ongoing research include new opportunities and strategies for these technology-driven solutions, culminating in the development of a new conceptual offsite hub-and-spoke model. These are presented for discussion. This model allows decision-makers to interact with data in order to optimise solutions in line with demand and resource requirements.
Reference54 articles.
1. Prefabricated Volumetric Building Systems Market Report 10th,2021
2. Glossary of Terms-Buildoffsite;Gibb,2005
3. Quantifying the waste reduction potential of using prefabrication in building construction in Hong Kong;Jaillon;Waste Management,2009
4. Effects of Lean Construction on Sustainability of Modular Homebuilding;Nahmens;Journal of Architectural Engineering,2012
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献