Author:
Lin He,Gaosheng Rong,Ning Ma,Li Chen,Bo Huang,Xiaofan Guo
Abstract
Abstract
The purchase cost of equipment and materials occupies a large proportion in the cost of power grid production technological transformation projects, and has a greater impact on project cost control. Therefore, strengthening the management of equipment and material price forecasts and improving the scientificity and accuracy of forecasting methods are important for improving production technology. It is of great significance to improve the cost management of the whole process of the project and improve the lean management level of the investment of power grid enterprises. In this paper, combined with the current situation of equipment and material price forecasting for the production technological transformation projects of power grid enterprises, a combination forecasting model based on unary linear regression and gray theory is constructed, and the validity of the model is verified through empirical analysis.
Reference5 articles.
1. Identification of key factors in power grid technological transformation project cost based on grey correlation method[J];Biao;Finance and Accounting Communications,2019
2. Research on the cost difference of technological transformation projects in Beijing and Shanghai based on big data analysis [J];Yihe;Electricity and Energy,2019
Cited by
4 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献