The Use of Weather Website Data for Construction Project Decision-Making in The Short Term

Author:

Mohammed Safaa S.,Kadhim Noor R.,Abdulrasool Abdulrasool Thamer,Al Shaikhli Hasan Ibrahim

Abstract

Abstract In most work sites, it is a priority to keep the work going well and to avoid unforeseen incidents. Fluctuations in weather conditions are one of the factors affecting the continuity of work in construction projects. Indeed, for example, the temperature is important in concrete and asphalt works, and wind speed is important in lifting and high construction works. Therefore, taking the appropriate decision, starting and completing the work, is very important to maintain the quality of the project. This research aims to demonstrate the reliability of short-term decision-making through data taken from the weather site five days before the time to work. The data was collected for a month, five days before the intended day and on the same day, day and night, for different weather factors by weather location such as temperature, humidity, possibility of rain, Uv index, wind speed. By analyzing the data, it was found that there was little difference in those predictors of all the factors recorded. To conclude at the end of the study that it is possible to rely on the decision-making on the weather location in small and medium projects, but in large and sensitive projects, they need to rely on more accurate data than relying on weather location data.

Publisher

IOP Publishing

Subject

General Engineering

Reference28 articles.

1. The significant factors causing delay of building construction projects in Malaysia;Alaghbari;Eng Constr Archit Manag.,2007

2. Causes of delay in road construction projects in Malawi;Mahamid;J South African Inst Civ Eng.,2013

3. Quantification of Delay Factors Using the Relative Importance Index Method for Construction Projects in Turkey;Gündüz;J Manag Eng.,2013

4. Causes of Delay in Construction Projects in the Oil and Gas Industry in the Gulf Cooperation Council Countries: A Case Study;Ruqaishi;J Manag Eng.,2015

5. Method for calculating schedule delay considering weather conditions;Thorpe,2008

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3