Analysis of Construction Implementation Time and Cost Scheduling by Adjusting Budget Changes Due to the Covid-19 Pandemic (Case Study on the Randugunting Dam Construction Project)

Author:

Setiyono B,Wahyudi S I,Adi H P

Abstract

Abstract The Randugunting Dam, located in Blora Regency, is planned to have a capacity of 10.40 million m and is expected to irrigate an area of 630 Ha, providing a raw water supply of 0.15 m/second. The construction activity of the Randugunting Dam is one of the construction works that has been affected by the Covid-19 pandemic, namely cash flow is hampered. Therefore we need an analysis of cash flow management scenarios and determining strategies for handling the impact of the pandemic on implementation. The data used in this study is the result of interviews with the project implementation team for the Randugunting Dam construction, and data on the project cost budget. Cash flow management analysis is carried out by applying 3 scenarios, namely: scenario 1 (fixed time), scenario 2 (slowed down time), and scenario 3 (accelerated time). The analysis was carried out with the help of the Microsoft Project 2010. The determination of the handling strategy in this study used the DSS (Decision Support System) method, and the SWOT (Strength, Weakness, Opportunity, and Threat). The results of the study chose scenario 3, which is to speed up the time of 6 months. Acceleration is done by increasing the working time. The annual cost required is higher than scenario 1 (fixed time) and 2 (delayed time by 7 months), but the building is completed faster and can be used immediately. The strategy generated by SWOT analysis is Diversity Strategy and produces 8 (eight) strategies. Diversity Strategy is a strategy by maximizing internal strength factors (S), namely increasing the internal capabilities of project implementers and avoiding external threat factors (T), especially related to the Covid-19 pandemic.

Publisher

IOP Publishing

Subject

General Engineering

Reference11 articles.

1. The benefits of river normalization of Guntur weir upstream to irrigation area service in Demak Regency Central Java Indonesia;Imawan;IOP Conference Series: Materials Science and Engineering,2020

2. Perbandingan Aplikasi Program Microsoft Project dan Primavera dalam Penjadwalan Proyek Konstruksi;Octavia;Jurnal Dimensi Pratama Teknik Sipil,2013

3. Enhancing SWOT analysis with TRIZ-based tools to integrate systematic innovation in early task design;Brad;Procedia engineering,2015

4. Decision Support System for Selecting Type of Moveable Dam Gate to Handle Tidal Flood Issued (A Case Study in The Parid River, Cilacap, Indonesia);Adi;Journal of Physics: Conference Series,2020

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3