Jamalluddin Nur Atiqah,Adnan Hamimah,Bakhary Nor Azmi,Rosman Muhammad Redza
Abstract
Abstract
To encourage IBS in the Malaysian construction sector, the government and the CIDB have introduced programmes and initiatives to enhance the adoption of the Industrialized Building System (IBS). The introduction of the Master Plan for Construction Industry (CIMP 2006–2015) creates the opportunity for the construction industry’s future in Malaysia. It has highlighted the importance of IBS and its environmental in the construction industry. This paper aims to recommend risk mitigation strategies in Industrialized Building System projects in Malaysia. The quantitative methodology involved the questionnaire survey and gives out to 146 IBS practitioners in Malaysia construction and only about 34% had responded to this questionnaire. It was found that many participants were implementing risk mitigation in the IBS project and adequate knowledge is essential in reducing risk on the IBS project. The risk factors that must be considered when implementing IBS construction are design, managerial, financial, safety and logistical factors which are design defects, poor understanding and monitoring skills in IBS construction, high material cost, poor safety scheduling, and difficulties transport IBS components. To address and overcome the risk factors, some risk mitigation strategies are proposed with the risk associated with the Industrialized Building System (IBS) projects. It is recommended that the implementation of the standardization of the IBS module, enhance the use of BIM in the IBS project, training and guidance to improve financial strategies, integrating the advanced Avs and Just-in- Time delivery is highlighted as risk mitigation strategies in IBS construction.
Reference17 articles.
1. Implementation of risk management in the Malaysian construction industry;Abdul-Rahman,2015
2. Safety And Health Perceptions In Work-related Transport Activities In Ghanaian Industries;Atombo;Safety and Health at Work,2017
3. Key Constraints and Mitigation Strategies for Prefabricated Prefinished;Hwang,2018
4. Current Practices of Risk Management in the Malaysia Construction Industry-The Process and Tools/Techniques;Kang,2015
5. The impacts of industrialization on construction subcontractors: a resource-based view;Goh;Construction Management and Economics. Taylor & Francis Journals,2017
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献