Abstract
Abstract
Risk allocation is one of the important aspects in risk management. However, there is a tendency that risks in construction are being allocated to parties that are least able to resist taking on the risk rather than parties that are more capable to manage the risks. There are different types of procurement that led to different approaches in settling risk allocation between contracting parties. This paper aims to identify risk allocation for different procurement types in construction projects focusing on traditional, design-build and public-private partnership procurement. For this research, a quantitative method was used, where 354 sets of questionnaires were distributed to selected construction firms in Klang Valley. Ninety-two (92) sets of questionnaires were returned and analyzed and the respondents were asked to rate the probability of risk occurrence. The result indicated that the top ranked risk factors are ‘unstable government’, ‘delay in project approvals and permits’, ‘fluctuation of material cost’, ‘poorly written contract’ and ‘inadequate specification in contract’. The recommended risk allocation by respondent for each procurement is presented and found that client and contractor in Traditional procurement, the risks are allocate based on its nature of work. In Design-build, risk factors are mainly allocated to contractor. While in PPP, both contracting parties prefer the majority of the risk factors to be shared. The results of this research will assist practitioners in allocating risks to the party that most qualified to analyze, control, and manage these risks.
Reference32 articles.
1. Preliminaries and Their Prices for Residential Buildins: ACritical Analysis;Abdul Rashid;Malaysian Construction Research Journal (MCRJ),2017
2. Malaysian Public Private Partnership Projects: Project Success Definition;Ahmad;International Journal of Engineering & Technology,2018
3. An evaluation of the impact of risk cost on risk allocation in public private partnership projects. Engineering;Almarri,2019
4. Risk assessment and allocation in the contract for publicworks used in Saudi Arabia construction industry;Ashmawi;Cogent Engineering,2018
5. The importance of employer accommodation on the job and duration of workers with disabilities: a hazard model approach;Burkhauser;Lab. Econ,2016
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献