A method to construct a main hole structural plane model based on advanced parallel adit geological body

Author:

Zhang Shuainan,Wu Wei,Zhang Min,Huang Yong,Fu Wei

Abstract

Abstract The advanced parallel adit of tunnel refers to the adit parallel to the direction of the main hole. Generally it is spaced tens of meters from the axis of the positive hole. During the tunnel construction, the parallel adit is driven before the main hole. Main function of it is to provide geological reference for the subsequent excavation of the main hole. At the same time, it can also help improve the long-term construction and operation and maintenance efficiency of the main tunnel. In terms of providing geological prediction information for the main tunnel, the surrounding rock information disclosed in the advanced parallel adit excavation is mainly used for surrounding rock classification and geological sketch, so as to qualitative analysis the possible geological conditions when the positive tunnel is excavated near the distance where the advanced parallel adit is located. However, the above methods cannot accurately and quantitatively analysis the geological conditions that the main tunnel will face. The lack of research on the correlation between the main tunnel and the advanced parallel adit geological conditions results in the waste of the key factor of the horizontal geological information.In this paper, the improved DBSCAN clustering algorithm is used to group the dominant structural planes according to the attitude of rock and other information. Some non-primary structural planes are screened out. The average distance between the same group of structural planes is calculated according to the average attitude of the dominant structural plane. The structural planes that are close enough are fused. Then, the axial and radial projection was carried out to form a larger range of surrounding rock fracture models. When the main tunnel is excavated to the relevant area, the situation of the surrounding rock in front can be predicted according to the model, so that the countermeasures can be made in advance. The method in this paper is applied to a tunnel project with bidirectional single line and advanced parallel adit. The prediction results after tunnel excavated show that the method in this paper is reasonable and effective.

Publisher

IOP Publishing

Reference16 articles.

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3