Author:
Xu Gangnian,Yu Xinbo,Li Dawei,Chen Zihua,Zong Xu
Abstract
Abstract
The main girder of Dongming Huanghe River Highway Bridge was the first prestressed concrete (PC) continuous box girder bridge strengthened by a cable-stayed system in China. In order to study the temperature effect of the main girder structure of Dongming Huanghe River Highway Bridge after reinforcement, based on the measured data of middle span deflection, key section strain and typical crack width, the curve equations of strain and temperature of main girder were obtained by the regression analysis method. The results show that the annual strain value of main girder changed with the acquisition time in a sinusoidal function, and was linearly related to the temperature. The variation of mid-span deflection decreased gradually from side span to middle span, and varied dynamically with temperature in the whole girder, which also has obvious correlation with temperature. The crack width fluctuated up and down in a certain numerical range, which belonged to respiratory cracks and had equally correlation with temperature.
Reference11 articles.
1. Damage analysis for PC continuous rigid frame bridge based on structural perform;Zhang;Journal of Southwest Jiaotong University,2009
2. Excessive Long-time of prestressed box girders. I: record-span bridge in Palau and other paradigms;BaŽant;Journal of Structural Engineering,2012
3. External steel plate systems for the shear strengthening of reinforced concrete beams;Barnes;Engineering Structures,2001
4. FRP strengthening of full-scale PC girders;Di Ludovico;Jounral of Composites for Construction,2010